DLHC was awarded a design-build contract for a 2,900 SF interior build out of a Cardiac Cath Lab in Sanford. The estimated start date is 6-1-17 with a 3 month construction duration.
DLHC was awarded a design-build contract for a 2,900 SF interior build out of a Cardiac Cath Lab in Sanford. The estimated start date is 6-1-17 with a 3 month construction duration.